Temple Mills
The Temple Mills Depot is a £400M maintenance depot for the Eurostar rolling stock.It serves the new high speed route between St. Pancras and the Eurotunnel.
The high speed route (HS1) opened on 14th November 2007 taking passengers between St Pancras and Paris in 2 hours 15 minutes and Brussels in less than 2 hours at speeds of up to 186mph.
The 109 km high-speed rail link is the first major new railway to be built in this country in over a century.
Temple Mills is designed to house 8-train roads. The overall dimensions of the 8-road shed will be just under 450m long by 64m wide
The maintenance shed and all ancillary buildings were protection against lightning and were fitted with earthing systems where applicable.
Reach for the sky.
Catenary mast protection system to sensitive project in Bedfordshire
March 23rd 2010
Light at the end of the tunnel.
Cuttings are proud to announce having secured significant works at the A1M Hatfield Tunnel refurbishment project.
March 19th 2010
Health & Safety Hierarchy
IOSH Health & Safety training obtained by Cuttings management
February 24th 2010
Cuttings achieve Achilles accreditation
Cuttings obtain Achilles accreditation - certificate available for download in the website Downloads section.
December 23rd 2009